It is reported that Bao Steel DE Sheng Industrial Management Minister Li Feng said: "Bao Steel DE Sheng two black rolling annealing pickling project early piling is near the end stage, is expected to start construction in mid-September plant, November will be done factory cappings, the next installation and commissioning Equipment, the end of July 2018 can be put into production. After the production of the black roll annealing and pickling project of Bao Steel DE Sheng Phase II project, can be achieved directly to suppress stainless steel black curls, with an annual output of 700,000 tons of stainless steel pickling volume, the annual output value About 40.67 million yuan, the project will be eliminat the company's existing part of the backward solution pickling production line. At the same time while the follow-up cold rolling process to provide qualified thin material.
In addition, Bao Steel DE Sheng Phase II will also construction including move 1 steelmaking continuous casting production line, 1 1780 mm hot rolling production line, 1 the new annealing pickling line and the construction of 50000 tons terminal 1, with a total investment of 4 billion yuan, after the completion of phase ii project, annual production value of 20 billion yuan of above, would considerably increase the production of 400 is the product's strength, the top 200 series, 300 series, 400 series complete coverage of varieties, significantly enhance comprehensive competitiveness, and promote the development of downstream stainless steel industry.
Keyword: stainless steel annealing, stainless steel pickling, Bao Steel, stainless steel.
Contact: HongYue Stainless Steel
Phone: 189 2998 9055
Tel: +86 (0)757 2932 8272
Email: info@hystainless.com
Add: HongYue Stainless Steel